Al-Bayati, A J and Panzer, L (2019) Reducing Damage to Underground Utilities: Lessons Learned from Damage Data and Excavators in North Carolina. Journal of Construction Engineering and Management, 145(12).

Andrić, J M, Wang, J, Zou, P X W, Zhang, J and Zhong, R (2019) Fuzzy Logic–Based Method for Risk Assessment of Belt and Road Infrastructure Projects. Journal of Construction Engineering and Management, 145(12).

Cha, G, Park, S and Oh, T (2019) A Terrestrial LiDAR-Based Detection of Shape Deformation for Maintenance of Bridge Structures. Journal of Construction Engineering and Management, 145(12).

Chang, T, Deng, X, Hwang, B and Zhao, X (2019) Improving Quantitative Assessment of Political Risk in International Construction Projects: The Case of Chinese Construction Companies. Journal of Construction Engineering and Management, 145(12).

Han, Y, Yin, Z, Liu, J, Jin, R, Gidado, K, Painting, N, Yang, Y and Yan, L (2019) Defining and Testing a Safety Cognition Framework Incorporating Safety Hazard Perception. Journal of Construction Engineering and Management, 145(12).

Innella, F, Arashpour, M and Bai, Y (2019) Lean Methodologies and Techniques for Modular Construction: Chronological and Critical Review. Journal of Construction Engineering and Management, 145(12).

Jebelli, H, Choi, B and Lee, S (2019) Application of Wearable Biosensors to Construction Sites. I: Assessing Workers’ Stress. Journal of Construction Engineering and Management, 145(12).

Jebelli, H, Choi, B and Lee, S (2019) Application of Wearable Biosensors to Construction Sites. II: Assessing Workers’ Physical Demand. Journal of Construction Engineering and Management, 145(12).

Li, X, Li, H, Cao, D, Tang, Y, Luo, X and Wang, G (2019) Modeling Dynamics of Project-Based Collaborative Networks for BIM Implementation in the Construction Industry: Empirical Study in Hong Kong. Journal of Construction Engineering and Management, 145(12).

Luo, S, Liu, Z, Yang, X, Lu, Q and Yin, J (2019) Construction Technology of Warm and Hot Mix Epoxy Asphalt Paving for Long-Span Steel Bridge. Journal of Construction Engineering and Management, 145(12).

Olivieri, H, Seppänen, O, Alves, T d C L, Scala, N M, Schiavone, V, Liu, M and Granja, A D (2019) Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques. Journal of Construction Engineering and Management, 145(12).

  • Type: Journal Article
  • Keywords: Construction; Scheduling; Critical path method; Last planner system; Location-based systems;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001644
  • Abstract:
    In construction, the most relevant systems used for project management (PM) and project production management (PPM) in the planning and control phases are critical path method (CPM), last planner system (LPS), and location-based techniques (LB). Studies have addressed these systems, mostly in isolated fashions. This study aims to compare and contrast their use in terms of PM and PPM and clarify industry benefits in order to eliminate potential misunderstandings about their use. A survey was administered to construction professionals in Brazil, China, Finland, and the United States. No single system addresses all needs of PM and PPM. CPM is the dominant system when considering the following characteristics: primary industry types, type of organization, size of organization, professional position within the organization, and area of work. Contributions to knowledge include that CPM is a contract requirement with perceived benefits associated with critical path analysis; LB and LPS have perceived benefits regarding continuous flow and use of resources, treatment of interferences, and improving production control. All systems were found to have a similar level of benefits for management of contracts, delay and change, and evaluation of the root causes of delays. The industry can benefit from aligning project scheduling methods with project needs.

Voordijk, J T (2019) Technological Mediation in Construction: Postphenomenological Inquiry into Digital Technologies. Journal of Construction Engineering and Management, 145(12).

Yeganeh, A A, Azizi, M and Falsafi, R (2019) Root Causes of Design-Construction Interface Problems in Iranian Design-Build Projects. Journal of Construction Engineering and Management, 145(12).